Adaptation Actions
- (x) Remove Logging operations are compromised: erosion in logging area filter Logging operations are compromised: erosion in logging area
- (x) Remove Animal feed is unavailable or productivity is reduced filter Animal feed is unavailable or productivity is reduced
- (x) Remove Water-catchments and watersheds dry up filter Water-catchments and watersheds dry up
- (x) Remove Food web, flora association, and symbiotic species disruptions filter Food web, flora association, and symbiotic species disruptions
- (x) Remove Waterlogged and anaerobic soils filter Waterlogged and anaerobic soils
- (x) Remove Animals and their enclosures are exposed to climate extremes filter Animals and their enclosures are exposed to climate extremes
1 - 20 of 30
145 - Undertake ecosystem enrichment planting
145 - Undertake ecosystem enrichment planting
146 - Identify and focus on sensitive/vulnerable ecosystems for management
150 - Provide awareness on the importance of water catchment areas for water quality
151 - Establish protected areas over sensitive water catchments
152 - Reforest and rehabilitate forests within sensitive watershed and catchment areas
153 - Place and enforce buffer zones around streams and water sources
163 - Utilize appropriate building materials for livestock enclosres that can withstand climtic extremes
305 - Use downed braches as a soil erosion/runoff break (sloped areas)
306 - Gravel/pave roads in logging areas
307 - Maintain proper crossings (streams and rivers)
308 - Introduce sediment catchment devices (leaves/branches or other sediment traps)
309 - Practice good log stacking and log piling to maintain production quality during wet times
310 - Use cable logging rather than bulldozers
311 - Shift forestry operations to dry areas/islands during prolong rainy periods.
312 - Appropriately zone and spatially plan logging activities within concession areas
313 - Follow and plan forestry operations and activities according to Meteo forecasts and outlooks
314 - Reduce working hours/tasks during rain times
315 - Plan for the extra available labor during rain times, to do other jobs and functions
316 - Expand the use of protective gear and clothing