Adaptation Actions

1 - 20 of 80
60 - Raise/elevate river creek crossings highly
61 - Bury/lower river/creek crossings well underground
62 - If possible, have water pipes cross rivers/creeks at less vulnerable points up or down stream
63 - Use local knowledge of cyclone vulnerable areas when laying water pipes/infrastructure
145 - Undertake ecosystem enrichment planting
145 - Undertake ecosystem enrichment planting
146 - Identify and focus on sensitive/vulnerable ecosystems for management
150 - Provide awareness on the importance of water catchment areas for water quality
151 - Establish protected areas over sensitive water catchments
152 - Reforest and rehabilitate forests within sensitive watershed and catchment areas
153 - Place and enforce buffer zones around streams and water sources
163 - Utilize appropriate building materials for livestock enclosres that can withstand climtic extremes
305 - Use downed braches as a soil erosion/runoff break (sloped areas)
306 - Gravel/pave roads in logging areas
307 - Maintain proper crossings (streams and rivers)
308 - Introduce sediment catchment devices (leaves/branches or other sediment traps)
309 - Practice good log stacking and log piling to maintain production quality during wet times
310 - Use cable logging rather than bulldozers
311 - Shift forestry operations to dry areas/islands during prolong rainy periods.
312 - Appropriately zone and spatially plan logging activities within concession areas