Adaptation Actions

1 - 17 of 17
55 - Thoroughly inspect all bullock fencing before a cyclone to cut out any living branches on posts (i.e. purao fences)
56 - Avoid corrosive fencing materials (i.e. barb wire)
57 - Allow glycine to grow over barbed wire fences to provide a physical barrier to salt exposure
163 - Utilize appropriate building materials for livestock enclosres that can withstand climtic extremes
293 - Identify and assist regeneration of water intolerant flora and fauna species
322 - Plant pasture grass species that can withstand flood conditions (para and elephant)
323 - Plant pasture grass species that can tolerate water (papolo and beans)
324 - Plant fodder tree species in pastures that tolerate water
325 - Move bullock to less flood prone areas including hill side grazing areas, and plateaus
326 - Make advance arrangements where bullock could be moved in case of flooding in the primary pastures
367 - Ensure proper drainage: outflow needs direction away from infrastructures and towards a safer place
368 - Check that hand pumps are properly sealed (at top of bore hole) to prevent contamination and back leakage
369 - Fully check the performance of new systems 3 months – 1 yr after construction
370 - Build homes with cement around the base so as to prevent inundation
371 - Build homes that are raised above ground level to prevent household inundation during floods
372 - Build walls and sea walls to prevent storm surge related flooding
373 - Develop health guidelines on consumption and contamination by air pollution and ash