Adaptation Actions

1 - 20 of 25
55 - Thoroughly inspect all bullock fencing before a cyclone to cut out any living branches on posts (i.e. purao fences)
56 - Avoid corrosive fencing materials (i.e. barb wire)
57 - Allow glycine to grow over barbed wire fences to provide a physical barrier to salt exposure
147 - Undertake artificial germination of important species (nursery)
148 - Collect and store wildings for replanting
163 - Utilize appropriate building materials for livestock enclosres that can withstand climtic extremes
365 - Tanks should be conically shaped to avoid catching volcanic ash
366 - Utilize cement water tanks in areas with volcanic ash to neutralize water pH
367 - Ensure proper drainage: outflow needs direction away from infrastructures and towards a safer place
368 - Check that hand pumps are properly sealed (at top of bore hole) to prevent contamination and back leakage
369 - Fully check the performance of new systems 3 months – 1 yr after construction
370 - Build homes with cement around the base so as to prevent inundation
371 - Build homes that are raised above ground level to prevent household inundation during floods
372 - Build walls and sea walls to prevent storm surge related flooding
373 - Develop health guidelines on consumption and contamination by air pollution and ash
374 - Construct proper timber drying facilities to ensure timber is properly dried during rainy periods
375 - Apply chemical treatments for mould
472 - Plant coastal, native, endemic and site adapted species on beaches and vulnerable coasts trees to control erosion
473 - Plant/protect wetland species including mangroves to reduce erosion
473 (a) - Erosion of coastal forest areas