Adaptation Actions
- (x) Remove Logging operations are compromised: erosion in logging area filter Logging operations are compromised: erosion in logging area
- (x) Remove Damage to infrastructure (roads, water tanks/storage facilities- wooden tanks etc filter Damage to infrastructure (roads, water tanks/storage facilities- wooden tanks etc
- (x) Remove Forest seeds burnt and do not have a chance to germinate filter Forest seeds burnt and do not have a chance to germinate
1 - 20 of 25
55 - Thoroughly inspect all bullock fencing before a cyclone to cut out any living branches on posts (i.e. purao fences)
56 - Avoid corrosive fencing materials (i.e. barb wire)
57 - Allow glycine to grow over barbed wire fences to provide a physical barrier to salt exposure
305 - Use downed braches as a soil erosion/runoff break (sloped areas)
306 - Gravel/pave roads in logging areas
307 - Maintain proper crossings (streams and rivers)
308 - Introduce sediment catchment devices (leaves/branches or other sediment traps)
309 - Practice good log stacking and log piling to maintain production quality during wet times
310 - Use cable logging rather than bulldozers
311 - Shift forestry operations to dry areas/islands during prolong rainy periods.
312 - Appropriately zone and spatially plan logging activities within concession areas
313 - Follow and plan forestry operations and activities according to Meteo forecasts and outlooks
314 - Reduce working hours/tasks during rain times
315 - Plan for the extra available labor during rain times, to do other jobs and functions
316 - Expand the use of protective gear and clothing
317 - Introduce forestry workplace condition standards
318 - "Logging operations are compromised: erosion in logging area, muddy conditions, degraded roads and infrastructure, moisture & rust in equipment, machine idleness and breakdowns, wasted salaries/lost income, forgone timber harvests (economic), safety and health of workers.
"
367 - Ensure proper drainage: outflow needs direction away from infrastructures and towards a safer place
368 - Check that hand pumps are properly sealed (at top of bore hole) to prevent contamination and back leakage
369 - Fully check the performance of new systems 3 months – 1 yr after construction