Skip to main content
Description

The project consists of 5MWp solar photovoltaic (PV) plants with a 11.5 MW/6.75 MWh centralised battery energy storage system (BESS) with grid forming inverters (GIF) at Kawene, Undine Bay, and Bouffa in UNELCO’s Port Vila, Efate concession area grid which serves approximately 30% of Vanuatu’s population. The BESS will enhance climate resilience and stabilise grid integration of the PV plants. The project will also improve the reliability of the electricity supply to the water pumping station of Port Vila and thereby enhance the resilience of the water supply system. The project will contribute to Vanuatu’s NDC target by doubling the current amount of grid integration of renewable energy and decreasing diesel fuel consumption by up to 32%.

Funding
Donor
Organisation: Green Climate Fund (GCF)
Total Funding USD:
$12,900,000.00
Progress Indicator
0-25%
Project Status
Proposed
Project Scope
National
Project Type
Other
Implementing Entity/Organisation
Organisation: Ministry of Finance and Economic Management
Project Contact
Name: Antony Garae
Phone: 678 5035340
Additional details: City: Port Vila Department: Department of Energy Position: Director for the Department of Energy
Project Locations
Kawene - : Enhanced Climate Resilience and Grid Connected Renewable Energy through Battery Storage, Port Vila, VU
Undine Bay - : Enhanced Climate Resilience and Grid Connected Renewable Energy through Battery Storage, Port Vila, VU
Bouffa - : Enhanced Climate Resilience and Grid Connected Renewable Energy through Battery Storage, Port Vila, VU
Tagabe - : Enhanced Climate Resilience and Grid Connected Renewable Energy through Battery Storage, Port Vila, VU
Project Map Points